Sign in / register

FPC Updates

Latest Events

Nov
1
Event
9:30am - 2:00pm

The New World of Work: The HR event for the future workplace

View Advert (this link will open in a new window)

Scheduled downtime affecting import clearances

20 March 2019

We have been advised that the downtime affecting ALVS as a result of work on HMRC systems, due to take place on Sunday 17 March, has been moved to Sunday 24 March. The same maintenance window will apply as before, 1700-1900hrs.

Due to the length and timing of the work manual fallback will not be invoked for APHA- and HMI-regulated imports. As usual, we advise that applications and entries are made either side of the downtime.

Join the FPC

FPC Linked-in Group

Fresh Live (this link will open in a new window)

Latest FPC Tweets

@Sian Thomas Recipe for Growth, Prosperity and Sustainability - FPC joins forces with UK food and drink industry to get politici… https://t.co/bmMZzQNR1F

@FPC FPC joins forces to set out Recipe for Growth, Prosperity and Sustainability: https://t.co/p3fUaGZUsB #Freshtalk https://t.co/FjQhOYGGJr

@Nigel Jenney RT @Chris_Bavin: Great night celebrating the fresh produce industry , congratulations to @BevingtonSalads for winnning wholesaler if the ye…

Terms and Conditions | Privacy Policy | Fresh Produce Consortium © 2019